Concrete Cooling Systems

Chilled water and ice, planned around your batching operation.

Bring water cooling, ice production, storage and controlled delivery into one coordinated equipment plan for your concrete plant.

System concept showing an ice plant, storage, ice conveying to a weighing hopper, cement silos and aggregate handling around a concrete batching plant
System concept · Equipment arrangement varies by project.View Full Size
Built around your application
  • Concrete batching plants
  • Dams & bridges
  • Large infrastructure pours

Understand the system

From the ice plant
to the concrete mixer.

See the main equipment and interfaces in one layout. Explore the numbered groups below for the role of each component.

Annotated concrete cooling concept with nine numbered components: ice production and storage, cooling towers, ice conveying, day tank and ice dosing, concrete mixer, cement silos, aggregate bins and conveyor, optional aggregate precooling, and batching controls.
System concept · Final layout and supply scope are defined for each project.View Annotated Diagram
01–04Ice production & delivery

Ice production, refrigeration, storage and delivery are planned around the required cooling duty and batching schedule.

01Ice production & storage
Generate ice and hold a buffer for peak batching periods.
02Cooling towers
Reject heat from the refrigeration system where water cooling is selected.
03Ice conveying
Transfer ice from the store towards the batching equipment.
04Day tank & ice dosing
Buffer ice near the mixer and coordinate dosing with the agreed batching arrangement.
05–07 / 09Batching plant interfaces

Connect the cooling package to the mixer, material handling and batching controls. Supply responsibilities are defined for each project.

05Concrete mixer
Receives the agreed ice and water quantities within the mixing process.
06Cement silos
Part of the batching plant material supply.
07Aggregate bins & conveyor
Part of the batching plant aggregate handling.
09Batching controls
Coordinate the agreed equipment signals and production sequence.
08Optional aggregate precooling

Consider aggregate precooling where the material temperatures and concrete temperature target require it.

08Aggregate precooling
Water circulation and cooling equipment are selected for the project duty and site arrangement.

Inside a working installation

One system.
Coordinated operation.

For larger ice plants, ice generators, compressor capacity, refrigeration pipework and PLC control are planned together. Freezing and harvesting sequences are coordinated with storage and delivery to the batching plant.

Jinduo ice-making equipment with insulated refrigeration pipework and a maintenance walkway at a Hong Kong site
Ice-making equipment and insulated refrigeration pipework.
Ice discharge · Site footage.

Integrated refrigeration

Coordinate ice generators, refrigeration equipment and pipework around the production duty.

Sequenced operation

Plan freezing and harvesting across the system through PLC control.

Demand-led storage

Match production, buffer storage and delivery to daily demand and peak batching periods.

Make it. Store it. Deliver it.

  1. Produce

    Make ice within a coordinated refrigeration system.

  2. Store

    Buffer the difference between ice production and batching demand.

  3. Convey

    Arrange controlled discharge and screw conveyors around the plant layout.

  4. Supply the mixer

    Deliver to a day tank near the mixer. Coordinate ice dosing with the mix-water allowance and mixing cycle.

Chilled water alongside the ice supply

Plan the water
and ice together.

Chilled-water equipment can be planned alongside the ice system. Define water temperature, flow, buffer storage and supply around the concrete mix and operating schedule.

  1. Water cooling
  2. Insulated storage
  3. Pumped supply
Water pumps, valves and connected pipework installed beside refrigeration equipment
Pumps, valves and water pipework.
Jinduo refrigeration packages with compressors, vessels and electrical control cabinets
Refrigeration packages and local controls.

Jinduo project experience

Cooling systems
in the field.

All Projects
Elevated industrial chilled-water equipment beside a green-clad plant building in Hong Kong

Chilled mixing water

Hong Kong

Two-stage water cooling

27 m³/h design flow · 0°C outlet water

A containerized design cools water from ambient to 4°C, then to 0°C. Jinduo provided design and equipment supply.

Explore the Project

Start with your batching requirement

Let’s define your
cooling system.

Share your production requirements and site conditions. We’ll help define the cooling duty, equipment arrangement and interfaces for your project.

Plan Your Cooling System

Information for system selection

Concrete output
m³/h, batching cycle and operating hours per day
Mix design
Mix-water allowance, cement and aggregate quantities, and aggregate moisture
Incoming temperatures
Water, cement, aggregate and maximum ambient temperature
Temperature target
Required concrete discharge temperature and delivery conditions
Site & utilities
Project location, water supply, electrical supply and available layout
Storage & automation
Peak demand, required buffer storage and batching-control interfaces