Skip to content
Request a Quote

JINDUO COOLING · SINCE 1996

Industrial Ice Machines.Tube, Flake and Block Ice.

Choose an ice type and daily output. Plan the refrigeration, storage and handling needed at your site.

Three ice types

Choose the ice for your application.

Compare the shape, use and industries served by tube, flake and block ice.

Illustration of cylindrical tube ice with an open centre

Hollow cylindrical ice

Tube Ice

Hollow cylinders for beverage service and packaged ice supply, also used in larger concrete cooling systems.

Tube Ice Machines
Illustration of thin, irregular flakes of ice

Thin, irregular flakes

Flake Ice

Small flakes spread around the product for direct contact cooling, from fresh seafood to food processing.

Flake Ice Machines
Illustration of solid rectangular blocks of ice

Solid rectangular blocks

Block Ice

Large solid blocks for ice distribution and transport, handled individually or crushed where the ice is used.

Block Ice Machines
Concrete batching plant illustrating a concrete cooling application

Concrete Cooling

Chilled water and ice for concrete batching.

Plan chilled-water supply, ice production, storage and conveying for the batching operation.

Start with batching output, material temperatures and the required concrete discharge temperature.

Explore Solution

Beyond the ice machine

From one machine
to a working ice system.

Bring production, refrigeration, storage and handling into one coordinated equipment plan.

See Installed Projects
  1. 01

    Ice production

    Choose the ice type and machine output from daily demand.

  2. 02

    Refrigeration

    Coordinate refrigeration and heat rejection with site utilities.

  3. 03

    Storage & conveying

    Plan how ice is stored, moved and delivered to the point of use.

  4. 04

    Controls & interfaces

    Connect the equipment sequence to the wider project operation.

Jinduo’s Area A manufacturing floor in Heshan, Jiangmen
Area A manufacturing floor · Heshan, Jiangmen

Refrigeration manufacturing roots since 1996

The workshop behind your equipment.

At Jinduo’s Heshan facility, engineering and production teams work through fabrication, assembly and pre-delivery testing.

Explore Manufacturing
01Fabrication

See the component work behind the equipment, from large part turning to heat exchanger tube sheets.

A large component undergoing a turning operation
Large component turning
A heat exchanger tube sheet during fabrication
Heat exchanger tube sheet
02Assembly

Equipment assembly brings the machine frame, refrigeration components and controls together.

A Jinduo tube ice machine under assembly in the workshop
Tube ice machine assembly in progress
03Pre-delivery testing

Review the agreed factory checks and documentation as part of your equipment supply.

Explore Quality & Testing

Supporting refrigeration equipment

The equipment
around the system.

Explore heat transfer and pressure components for a separate equipment requirement or a wider refrigeration project.

Plan the supply with us

A clear route from requirement to delivery.

  1. 01

    Share your requirement

    Start with the application, daily ice need and project location.

  2. 02

    Define the configuration

    Review the machine, utilities and site arrangement in a technical proposal.

  3. 03

    Confirm checks & documents

    Agree the inspection and documentation needed before shipment.

  4. 04

    Coordinate the shipment

    Plan packing, shipping documents and the export requirements.

Let’s start with your application

Tell us what you need to cool.

Share your application, daily capacity and project location. We’ll help define the equipment around it.