Jinduo Project Case Study

150 TPD Tube Ice Plant for Commercial Ice Production

Commissioned in 2021 in Sheung Shui, Hong Kong, this commercial tube-ice plant uses three 50 t/day tube-ice units for a combined design capacity of 150 t/day. Its 200 t ice-storage system supplies nearby concrete batching plants.

This page presents Jinduo’s confirmed role and approved facts from a real project. The client name and sensitive commercial details are withheld to protect confidentiality.

Overhead view of refrigeration equipment, vessels and pipework in a Sheung Shui tube-ice plant

Project Overview

Commissioned in 2021 in Sheung Shui, Hong Kong, this commercial tube-ice plant uses three 50 t/day tube-ice units for a combined design capacity of 150 t/day. Its 200 t ice-storage system supplies nearby concrete batching plants.

Project Requirement

The project required high-volume commercial tube-ice production, 200 t of storage, and controlled distribution to nearby concrete batching plants. The production system combines three 50 t/day tube-ice units for a total design capacity of 150 t/day.

Jinduo Supply Scope

Jinduo’s project scope covered system design and integration, three 50 t/day tube-ice units, refrigeration packages, 200 t of ice storage, screw conveying, control-system integration, installation, and commissioning.

Installed System

The approved photographs show the installed production units, refrigeration equipment, vessels, insulated process pipework, electrical cabinets, local controls, structural access platforms, conveying equipment, and a discharge hopper. The photographs document the equipment arrangement without being treated as current production or performance-test data.

Project Gallery

The gallery records the production, refrigeration, control, and ice-handling systems visible in the original project photographs.

Project Result

Commissioned in 2021, the completed plant integrates three 50 t/day tube-ice units with refrigeration, 200 t of ice storage, screw conveying, and controls. The storage and distribution system supplies nearby concrete batching plants, while 150 t/day remains the confirmed combined design capacity.

Discuss a Similar Requirement

Planning a Related Refrigeration Project?

Share the application, required capacity or duty, utilities, operating conditions, site constraints, and documentation requirements.