Skip to content
Request a Quote

Project Evidence

Projects & Case Studies

Jinduo and its joint-venture partner have pioneered the application of integrated refrigeration and ice-production systems in the concrete sector. The project scope includes custom-designed ice-making equipment with 25% power savings, automated storage bins, and high-capacity conveying for controlled ice discharge. After operation at two installed locations, the system recorded a 25% reduction in ice-production cost per tonne.

Explore the selected projects below, or contact us to request the closest available reference for your capacity, application, and site requirements.

Field References

Selected Jinduo Projects

These genuine Jinduo project references show how Jinduo and its Hong Kong joint-venture engineering partner deliver integrated refrigeration and ice-production systems for concrete applications. The approved project description states 25% power savings, and after operation at two installed sites the system recorded a 25% reduction in ice-production cost per tonne. The selected projects below demonstrate capacities up to 150 t/day, automated storage and conveying, and two-stage chilled-water engineering.

Tsing Yi, Hong Kong 2019 100 t/day design capacity Jinduo Project

100 TPD Tube Ice System for Concrete Cooling

This 100 t/day tube-ice system was commissioned in 2019 for a concrete batching plant in Tsing Yi, Hong Kong. It includes a fully automated variable-pitch screw-bed ice store with a capacity of 45 t and a screw conveyor that feeds the day tank and supports external loading for other batching plants.

View Project Details
Sheung Shui, Hong Kong 2021 150 t/day design capacity · 3 × 50 t/day tube-ice units Jinduo Project

150 TPD Tube Ice Plant for Commercial Ice Production

Commissioned in 2021 in Sheung Shui, Hong Kong, this commercial tube-ice plant uses three 50 t/day tube-ice units for a combined design capacity of 150 t/day. Its 200 t ice-storage system supplies nearby concrete batching plants.

View Project Details
Hong Kong 27 m³/h design flow · 0°C outlet water Chilled-water supply for batching operations Jinduo Project

27 m³/h Two-Stage Chilled-Water System at 0°C

Jinduo designed and supplied this containerized two-stage chilled-water system for a batching plant in Hong Kong. A flooded evaporator cools water from ambient temperature to 4°C before a submerged dry-expansion evaporator lowers it to 0°C at a design flow of 27 m³/h.

View Project Details

Verified Project Basis

Real Projects, Project-Specific Evidence

Every published case on this page is a Jinduo project, checked against project-specific records and photographs available for public release. Performance statements are included when they form part of the approved company project record; they describe the referenced installations and are not universal performance guarantees.

Client names, exact addresses, commercial terms, and confidential documents remain withheld unless approved for release.

Project Delivery

How Jinduo Handles Complex Industrial Projects

Large refrigeration projects require coordinated engineering, manufacturing, integration, and site support. The exact Jinduo scope is stated on each case.

01 · Engineering

Engineering & Scope Definition

Cooling duty, operating conditions, equipment configuration, interfaces, drawings, and documentation aligned with the project requirement.

  • Cooling Duty
  • System Configuration
  • Project Interfaces

02 · Manufacturing

Equipment Manufacturing

Ice-making and refrigeration equipment packages built and checked against the agreed project specification.

  • Ice-Making Equipment
  • Refrigeration Packages
  • Factory Checks

03 · Integration

System Integration & Controls

Refrigeration, storage, conveying, controls, utilities, and site interfaces coordinated as one system where included in scope.

  • Storage & Handling
  • Control Integration
  • Site Interfaces

04 · Site Support

Installation & Commissioning Support

Site installation, commissioning, and handover support provided where included in the contracted Jinduo scope.

  • Installation
  • Commissioning
  • Handover Support

Plan Your Project with Jinduo

Planning a High-Capacity Ice or Cooling System?

Share your required capacity, operating conditions, utilities, and site constraints. Our engineering team can compare them with relevant Jinduo project experience and define an appropriate equipment, integration, and documentation scope.

Discuss Your Project

Please include:

  • Required production capacity or cooling duty
  • Operating temperatures, environment, and schedule
  • Utilities, site layout, and space constraints
  • Storage, handling, automation, and control needs
  • Installation, commissioning, and documentation requirements

Jinduo will clarify the proposed equipment, performance basis, interfaces, testing, documentation, and delivery scope in the quotation.